Many enterprises mistakenly assume that development and test environments are “free” or exempt from licensing. In reality, IBM typically requires full software entitlements for non-production environments unless you negotiate otherwise.

Unlicensed development and test deployments can lead to compliance issues and hefty fees if discovered during an audit.

This guide, written from the perspective of an IBM licensing strategist, explains IBM’s rules for development and test environments, highlights common pitfalls, and outlines practical strategies to reduce costs.

CIOs, IT procurement teams, SAM/ITAM managers, and architects will learn how to stay compliant while minimizing spend on development, testing, training, and backup systems.

Read our ultimate guide, IBM License Models: PVU, RVU, Cloud Pak, SaaS, and Beyond.

Defining Dev/Test in IBM Contracts

In IBM licensing terms, “dev/test” refers to any non-production environment used for development, quality assurance (QA), testing, user acceptance testing (UAT), training, or disaster recovery purposes.

Essentially, these are systems that do not serve live production workloads.

It sounds straightforward, but the exact definitions in contracts (if they exist at all) matter a great deal. Unless explicitly defined and exempted in your IBM agreement, IBM considers these environments to require licensing just like production environments.

IBM’s default position is that any installed or running instance of their software is doing “work” – even if that work is testing or training – and therefore must be licensed. Non-production does not automatically mean non-chargeable.

For example, a training server used internally by your staff is still running IBM software, so IBM expects a license for it by default. The onus is on the customer to negotiate or invoke any exceptions.

One important distinction in IBM contracts is between a “warm standby” system and a “cold backup” system, particularly in the context of disaster recovery. A warm standby is a backup server that is installed and often running in sync (even if idle), ready to take over if production fails.

A cold backup refers to a server or instance that is powered off or not running unless a disaster occurs. IBM’s policies generally treat warm and cold backups differently from normal development and test servers. Warm/cold backups can, in some cases, be excluded from licensing (more on that later).

Still, a dev/test environment is not considered a standby backup – it’s an active environment for development or testing work. This means that, by IBM’s standard rules, your dev/test installations are not exempt simply because they’re non-production. Only explicitly designated backup systems may be exempt, and even then, only under specific conditions or contract clauses.

IBM’s Default Licensing Stance

Under IBM’s standard licensing metrics, every server and instance counts toward your license usage – regardless of whether it’s production or test. Suppose you deploy an IBM product on a system.

In that case, IBM assumes you have allocated the required entitlements (processor value units, authorized user licenses, Virtual Processor Cores for Cloud Paks, etc.) for that deployment.

There is no built-in concept of “free” non-production use in most IBM license agreements. In practical terms, this means a test or QA server is treated just like a production server when calculating license requirements.

For example, suppose you stand up an IBM Db2 database on a test cluster with 100 PVUs of capacity. In that case, IBM expects you to have 100 PVUs of Db2 licenses allocated to that cluster, unless your contract explicitly provides an exemption or discount for that environment. Many customers are surprised by this.

They assume that a DB2 instance used only for testing would somehow not require the same licensing as a production instance. However, IBM’s default stance is clear: if the software is installed and can run, it needs to be fully licensed.

The burden is on the customer to either purchase those licenses or ensure the contract has terms that say otherwise.

IBM sometimes offers separate “Non-Production” or “Dev/Test” license part numbers for certain products, but you don’t get those automatically. They have to be deliberately purchased and are typically only available for select IBM software.

These special non-prod licenses often come at a reduced cost (for instance, roughly 50% of full price), and they include restrictions that they be used only in non-production environments.

If such an option exists for a product (e.g., an “IBM WebSphere Non-Production” license), you’d still need to buy that entitlement – it’s not free, just cheaper. If no dev/test license variant exists for the product you’re using, IBM expects you to use regular (full) licenses even for your development or test installations.

The takeaway is that IBM’s default rule is to count every environment. Unless you have negotiated exceptions or are using a special, reduced-cost non-production SKU, assume that all your dev, test, QA, staging, training, and demo systems require full licensing.

IBM’s auditors certainly operate under that assumption, which can lead to compliance findings if a company only licenses production servers and ignores non-prod.

It’s a costly mistake that many organizations have made, only to be caught off guard during an audit when IBM requests proof of entitlements for test and development servers.

Negotiating Non-Production Rights

The good news is that while IBM’s baseline stance is strict, you can negotiate more favorable terms for non-production environments. In fact, savvy CIOs and IT procurement professionals make it a point to address dev/test licensing during contract negotiations or renewals.

IBM will not volunteer these concessions—you must request them and obtain them in writing. But if your account is valuable or you’re signing a large deal, IBM is often willing to grant some relief for non-production usage as part of the overall package.

Here are some key tactics and “asks” when negotiating non-production rights:

  • Reduced-Cost Dev/Test Entitlements: Aim to secure discounted licenses for any software deployed in development and testing environments. A common target is a 50% discount off the list price for non-production instances. For example, if you need 100 PVUs for a QA environment, negotiate to have those PVUs charged at half the rate. In some cases, IBM may have an official development or test part number (as mentioned, often accounting for ~50% of the production cost). If not, you can still negotiate a custom discount on licenses that you designate for non-prod use. The agreement should explicitly state the discount or special price for those licenses to avoid ambiguity later.
  • No-Charge Disaster Recovery/Backup Systems: Include language in your contract stating that cold backup systems are free of charge and that warm standbys are covered without requiring separate licenses. Many enterprises successfully negotiate clauses that allow for one cold DR instance per production instance to be maintained at no additional license cost, provided it’s only used during emergencies or periodic testing. For warm standbys (systems that are running but not serving production traffic), clarify with IBM how they will be treated – the goal is to not pay full price for a server that’s basically idle until a failover. IBM might allow a warm DR server to be unlicensed as long as it isn’t actively handling workload. But to be safe, negotiate it explicitly: e.g., “Customer may deploy one passive backup instance per production instance at no additional license charge, so long as the backup is only used for failover or disaster recovery testing.”
  • License Pooling Across Production and Non-Production: This is a more nuanced request, but it can be very powerful. The idea is to create a pool of license entitlements that can be flexibly used across production and non-production environments. In effect, you’d negotiate terms such that you don’t double-count licenses for the same software used in different environments. For instance, you might have 100 user licenses for an IBM application that are normally all assigned to production users. In a pooling arrangement, you could use some of those licenses for test systems or training environments as long as the total active use doesn’t exceed 100 at any time. Or, if you license by PVU, you may negotiate that your total PVU count covers both production and testing together, rather than requiring separate allotments. IBM is typically reluctant to allow full pooling (they’d rather sell you separate licenses). Still, if you have leverage, you might negotiate something like an allowance for concurrent use: e.g., “the customer may use up to 20% of their purchased entitlements in a non-production environment without additional cost, provided the total deployed does not exceed the licensed quantities.” The exact phrasing can vary, but the goal is to prevent paying twice for essentially the same capacity just because it’s in two different environments.
  • Enterprise License Agreements (ELAs) and Bundles: If you’re entering a big ELA or purchasing IBM Cloud Paks, use that opportunity to bundle in dev/test rights. Enterprise agreements can be crafted to include a certain number of non-production licenses at low or no cost. For example, in an ELA negotiation, you could insist on a clause that provides a complimentary non-production license for every production license purchased, for development/testing purposes. IBM sales teams have some flexibility here, especially if it helps close a large deal. Cloud Paks (IBM’s containerized software bundles) sometimes include vague terms regarding non-production usage; clarify and expand those. For instance, ensure the Cloud Pak terms specify how non-prod deployments consume entitlements—IBM might agree to count them at a lower weight (e.g., a test deployment might consume half the license units of a production deployment under the Cloud Pak’s rules). Always get these terms spelled out in the contract or at least in a binding email from IBM. Verbal assurances that “oh, we typically don’t charge for test” are worthless in an audit five years later unless it’s in writing.

Overall, negotiating non-production rights is about cost avoidance and risk avoidance. Every dev/test environment that you cover with special terms is one less surprise on your compliance report and one less line item on your budget.

Approach these negotiations with a bit of skepticism – assume IBM will charge you unless it’s explicitly stated otherwise. By being proactive and pushing for dev/test concessions, one can often save 15-30% on IBM costs (since many organizations have nearly as many non-prod instances as prod instances).

Don’t be afraid to ask for what you need; IBM reps have likely heard these requests before, and they often have some approved ways to accommodate them for strategic customers.

Compliance Risks

Using IBM software in non-production environments without proper licensing can expose your organization to significant compliance risks.

IBM’s license compliance audits (or “license reviews”) scrutinize all deployments, not just production.

Here are some common pitfalls and risk areas to watch out for:

  • “Reusing” Production Licenses for Dev/Test: A common misconception is that if you own enough licenses for production, you can simply use those entitlements for your test systems as well. Unless your contract explicitly allows this sharing or you carefully allocate the licenses between environments, this can lead to trouble. During an audit, IBM will separately count installations and usage in development and testing environments. If, for example, you have 10 processors licensed for WebSphere in production and another 10 processors running it in a test lab, IBM will expect 20 processors’ worth of licenses in total (again, unless you’ve negotiated some kind of pooling or exemption). If you only purchased 10, you’d be found under-licensed by 10 processors. That’s an audit finding, and you could be back-billed for those plus penalties. Never assume you can double-dip a license concurrently between prod and test without explicit permission.
  • Ambiguous Definitions of “Non-Production”: If your contract does include terms about non-production usage, make sure the definitions are crystal clear. We’ve seen disputes over what counts as “testing” versus “production.” For instance, is a staging environment (which mirrors production and maybe has limited internal users) considered non-production? It should be, but if that staging environment is used for any live transactions or live data, IBM might argue it’s actually production. Similarly, a training environment might be non-prod. Still, if it’s permanently up and being used by hundreds of employees, IBM could consider it a production service (since it provides a business function of employee training). The language in some contracts can be ambiguous, and IBM auditors may interpret it in their favor. Tip: Define non-production clearly (e.g., “Non-Production environments are those not used to support live business operations, including development, testing, QA, UAT, training, and disaster recovery testing. Use of these environments is limited to internal users and does not include processing live commercial transactions.”). Clear definitions up front prevent arguments later.
  • Unlicensed “Cold” Backups: Many companies assume that a backup server that’s powered off (cold standby) or used only rarely doesn’t require a license. IBM’s official policy typically allows cold backups without a license if they are truly cold (i.e., not running except in a disaster scenario) and are not used for any production activity. However, here’s the catch: if an audit finds an IBM program installed on a server, the auditors will ask for a license unless you can demonstrate it’s a legitimate cold standby under policy. If your contract doesn’t explicitly mention that your backup is license-exempt, you’ll have to rely on IBM’s standard policy and your own documentation to prove the case. Any deviation—say you turned on that cold server for a weekend test, or it’s actually kept in sync (which makes it more “warm” than cold)—could jeopardize the exemption. IBM might then say you owe licenses for it. We’ve seen situations where clients believed a DR server was free, but because they periodically ran it for quarterly DR drills without formal approval, IBM flagged it. The safest approach is to negotiate backup terms explicitly (as noted earlier) and to document any usage of the backup system thoroughly (dates of DR tests, confirmation that it was offline otherwise, etc.). Without clear terms, cold backups can become a gray area in compliance.
  • Neglecting ILMT in Virtualized Test Environments: If you’re running IBM software in virtual machines or containers in non-production, remember that IBM’s sub-capacity (virtualization) licensing rules require the IBM License Metric Tool (ILMT) or a similar approved tool to track usage. Some companies focus ILMT on production clusters and forget to include dev/test hosts. In an audit, IBM could refuse to grant you the sub-capacity licensing terms for those dev/test VMs if ILMT wasn’t recording their usage, potentially forcing you to license the full physical capacity. That can turn a small test VM (2 cores on a big host) from a requirement of 2 PVUs into, say, 32 PVUs (the whole host) in IBM’s eyes. Ensure that every environment is covered by ILMT, especially if you rely on sub-capacity licensing. It has low overhead and demonstrates good faith compliance management in both production and non-production systems. Missing ILMT data from a test server can be a technical “gotcha” that leads to non-compliance findings.
  • Audit Findings and Back-Billing: Ultimately, the compliance risk boils down to potential audit penalties and fines. IBM audits often result in big true-up bills for customers who didn’t license their non-production systems. It’s not uncommon for a company to carefully manage production licensing, yet end up owing millions because their dev/test and backup deployments were running unlicensed for years. IBM’s auditors will treat those as unlicensed use. Even if you had spare licenses on paper, if you didn’t formally allocate them or if you exceeded your entitlements at any point, you face exposure. The risk is heightened by the fact that dev/test setups are sometimes spun up ad hoc by engineers who assume it’s harmless—until an audit reveals 20 undocumented installs of WebSphere across various labs. Internal governance is key: track and record every IBM installation and ensure entitlements are assigned appropriately, regardless of environment. If you proactively negotiate broad non-production rights, you significantly reduce this risk because you have contractual protection. Without that, you’re relying on IBM’s standard policies (which are strict) and the hope that auditors will be understanding (hint: they rarely are).

Cost Optimization Strategies

Non-production environments can significantly drive up your IBM software costs if left unchecked. However, there are practical strategies to optimize costs for development and testing usage without breaching compliance.

Here are some approaches to consider:

  • Consolidate and Rationalize Environments: Every additional server or instance running IBM software in development or testing requires an additional license to be paid for. Take a hard look at how many separate development, QA, and staging systems you truly need. Often, multiple teams or projects set up their own test servers, resulting in a proliferation of underutilized instances. By consolidating workloads onto fewer shared development and testing servers, you can reduce the total license footprint. For example, instead of five different test servers each running a small WebSphere instance, you might use one or two larger servers or a single virtualized cluster partitioned for each team. This way, you license a smaller number of machines at higher utilization, rather than many lightly used machines each requiring full licensing. Rightsizing the capacity is part of this: if your test environment can run on 4 cores instead of 16, do that and only license 4 PVUs. It might involve some coordination among teams, but the savings can be substantial.
  • Use Virtualization and Sub-Capacity Licensing (with ILMT): As mentioned, IBM’s sub-capacity licensing allows you to pay for only the portion of a server’s capacity that you assign to IBM software, rather than the entire physical server – but only if you properly monitor it. Leverage virtualization to limit the CPU/RAM allocated to non-production instances. For example, run your IBM DB2 test database in a VM that has 2 CPUs allocated, even if the host machine has 16 CPUs. With ILMT tracking that VM, you’d only need to license those 2 CPUs’ worth of PVUs for DB2, not all 16. This strategy can isolate and shrink the license consumption of dev/test environments. Be vigilant in running ILMT or an approved tool to document sub-capacity usage. Virtualization also makes it easier to spin up and down environments. If a test environment is only needed during specific hours or phases of a project, shut it down when it is not in use. If it’s not running, it will not consume license counts in ILMT reporting. (And if truly offline for a long time, one could even uninstall to be extra safe.) The ability to rapidly provision and deprovision via VMs or containers means you only pay for IBM software when you actually need it, aligning costs more closely with usage.
  • Leverage Cheaper Editions or Free Tools for Non-Prod: IBM often provides different editions of its software, some of which are less expensive or even free for development purposes. Take advantage of these “developer” or community editions where possible. For instance, IBM Db2 has a Developer-C edition that is free for development and testing, with some limitations (like capping the number of cores or amount of memory). If Developer-C suffices for your dev work, you could avoid licensing Db2 in that environment entirely. Similarly, IBM may offer limited free entitlements through programs such as the IBM Developer Program or PartnerWorld for certain non-production uses. Always verify the terms – such free editions are usually not suitable for production data or performance testing at scale. However, for coding and initial functional testing, they might be sufficient. By using a lighter edition or open-source alternatives for development and testing where feasible, you reserve paid licenses for where they truly add value.
  • Cloud and On-Demand Environments: Consider utilizing cloud infrastructure for certain development and test workloads, particularly those that are ephemeral. IBM Cloud and other cloud providers (AWS/Azure with IBM software images) offer pay-as-you-go models for IBM software, where you pay for hourly or monthly usage. If your testing is project-based or occasional, running it in the cloud and tearing it down after tests can be more cost-effective than purchasing perpetual licenses for on-premises servers that sit idle for half the time. Furthermore, IBM’s Cloud Pak licensing is somewhat usage-flexible. If you have Cloud Pak entitlements, deploying a small test instance in a container might consume far fewer license credits (Virtual Processor Cores) than a full production deployment. In recent licensing models, IBM has introduced concepts where non-production deployments are counted at a reduced rate in terms of license consumption (for example, a non-production instance might be counted as 0.5 VPCs per core instead of 1 VPC, under certain Cloud Pak agreements). Check your specific Cloud Pak or IBM Cloud subscription details – you may already be entitled to spin up a limited development or test environment at little to no additional cost. And if you aren’t, this ties back to negotiation: push for such dev/test carve-outs in any new cloud-based licensing deal.
  • Align Purchasing with Non-Prod Needs: A strategic procurement move is to align your non-production licensing needs with large purchase or renewal cycles to get better pricing. Don’t wait until after you’ve signed a deal to then buy a handful of extra test licenses at full price. Instead, factor them into your big negotiations. For example, if you know you’ll need a certain number of QA environments for an upcoming project, include those in the initial quote when purchasing the software. Vendors often offer deeper discounts on larger deals, so those additional development and testing licenses will be effectively cheaper when purchased as a bundle. In enterprise license agreements, explicitly list the non-production entitlements you expect to use. It’s easier to get a 50% discount on 100 extra licenses as part of a multi-million dollar deal than it is to get the same concession on a one-off purchase later. By planning and bundling non-production requirements with production ones, you can leverage economies of scale and negotiation power to reduce costs.
  • Monitor and Reclaim: Treat non-production licenses with the same level of diligence as production licenses. Regularly review if all dev/test instances are still needed. When projects finish or environments go stale, uninstall or reallocate licenses. Perhaps you had 10 test servers for a major upgrade project; once it’s complete, shut them down to free up those entitlements for future use (or to reduce your renewal counts). IBM licenses, especially those on subscription & support, incur annual costs. Therefore, eliminating unnecessary non-production deployments before renewal can help save on maintenance fees. Some organizations even enforce internal policies that require any new non-production deployment to have a stated time frame or project attached, after which it’s evaluated for potential teardown. A lean non-production footprint results in lower spending.

By combining these strategies – consolidation, virtualization, special license programs, cloud options, and smart procurement timing – you can significantly cut the cost of IBM licensing for development and test environments while remaining compliant.

Many of these tactics require cross-team cooperation (between IT ops, finance, procurement, and development teams) and a strong understanding of IBM’s licensing rules. But the effort is worthwhile, given that non-production usage is often necessary but doesn’t directly generate revenue.

Every dollar saved on a test environment is a dollar that can be used elsewhere in IT, and every compliance risk mitigated is a potential audit pain avoided.

IBM Licensing Approaches for Dev/Test

The table below summarizes IBM’s default licensing approach for various non-production environments and what your negotiation target should be to optimize costs and flexibility:

EnvironmentIBM Default StanceNegotiation Target
Development (Dev)Full license required (treated same as prod)Discounted or included licenses for dev use (e.g. bundle with prod or use lower-cost dev SKUs)
Test/QAFull license required (no automatic discount)Discounted entitlements for testing (e.g. 50% off, or included in an ELA package)
TrainingFull license required (IBM counts it as usage)Free or nominal-cost licensing for training environments, if usage is limited and internal
Cold Backup (Disaster Recovery)Licensed by default (unless policy/contract says otherwise)Exempt from charges if truly cold standby (negotiate explicit no-charge backup rights)

How to read this: By default, IBM expects any Development, Test/QA, or Training installation to be fully licensed as if it were production. Your goal in negotiations is to either include those non-prod environments at little or no cost or to secure special discounted licensing for them.

For cold backup systems, IBM’s standard policy might not require a license if it’s never running, but to avoid doubt, you want the contract to explicitly confirm that no charges apply for your cold (and ideally warm) backup instances.

Checklist – Managing Dev/Test Licensing

Use this checklist to manage and optimize IBM licensing for your non-production environments:

All non-production servers identified: Make an inventory of every dev, test, QA, training, staging, and backup instance running IBM software. You can’t manage what you don’t know exists. Visibility is step one.

Contracts reviewed for dev/test clauses: Go through your IBM agreements to find any mention of non-production, dev/test, or DR usage rights. Note what is allowed and identify any gaps. If no clauses exist, assume no leniency and plan to negotiate some.

DR/backup licensing terms negotiated: Ensure your disaster recovery setups (especially warm and cold standbys) have explicit terms. If you’re in the middle of a renewal or ELA negotiation, request that clauses be added for free cold backup and clarified warm standby usage.

ILMT reporting covers virtualized test servers: Include all relevant non-production hosts in IBM’s License Metric Tool (or equivalent). This protects your sub-capacity licensing rights and provides an audit trail showing you’re in control of dev/test usage.

Discounts/exemptions benchmarked: Before negotiating, benchmark what concessions other similar enterprises have gotten for non-prod. For instance, it’s not unusual to know that a 50% discount for development and testing is offered, or a 1-for-1 development license per production license. Having these benchmarks strengthens your ask with IBM.

Renewal aligned with non-production needs: Plan your renewals and license true-ups with an eye on upcoming dev/test requirements. If you foresee expanding testing (new projects, migrations, etc.), incorporate that into your renewal negotiation so you can secure the necessary entitlements under the best terms, rather than scrambling later.

By following this checklist, you can proactively address non-production licensing in your software asset management practice rather than reactively dealing with surprises.

FAQs

Q: Does IBM charge for test environments?
A: Yes – by default, IBM will charge for test environments just like production, unless your contract explicitly exempts them. Always negotiate for reduced-cost or free development and testing entitlements in your IBM agreements to avoid paying full price for testing servers.

Q: Are cold backups free under IBM licensing?
A: Not by default. IBM generally requires a license unless the backup system is truly “cold” and not running. You should negotiate and document that cold backup instances are exempt from licensing fees; otherwise, IBM might challenge them during an audit.

Q: Can I reuse production entitlements for a test system?
A: Not without formal IBM approval or a contract clause. Using a production license for a test deployment without proper entitlement allocation creates a compliance exposure. In an audit, IBM could deem the test system unlicensed if it wasn’t covered by its own entitlement or an allowed share from production.

Q: Are training environments licensed separately from production?
A: Yes. Unless your contract says otherwise, training servers must be licensed just like any other environment. You might be able to include training uses as part of a dev/test license package or obtain them for free if you negotiate, but don’t assume they’re automatically covered.

Q: Can dev/test licenses be bundled into an Enterprise License Agreement (ELA)?
A: Absolutely. In fact, bundling non-production needs into an ELA is often the most cost-effective approach. You can negotiate a pool of dev/test licenses or provisions for non-production use at a discounted rate (or even at no extra cost) as part of the enterprise deal. This way, your non-prod usage is pre-approved and budgeted for, avoiding surprises down the road.

Read about our IBM Licensing Assessment Service.

IBM License Models Explained: PVU, RVU, Cloud Pak, SaaS — What They Mean for Your Costs

Do you want to know more about our IBM Licensing Services?

Author
  • Fredrik Filipsson

    Fredrik Filipsson is the co-founder of Redress Compliance, a leading independent advisory firm specializing in Oracle, Microsoft, SAP, IBM, and Salesforce licensing. With over 20 years of experience in software licensing and contract negotiations, Fredrik has helped hundreds of organizations—including numerous Fortune 500 companies—optimize costs, avoid compliance risks, and secure favorable terms with major software vendors. Fredrik built his expertise over two decades working directly for IBM, SAP, and Oracle, where he gained in-depth knowledge of their licensing programs and sales practices. For the past 11 years, he has worked as a consultant, advising global enterprises on complex licensing challenges and large-scale contract negotiations.

    View all posts